Common Property Waste Collection
Following the recent survey sent to the Owners Corporation members, those who responded overwhelmingly endorsed the provision of a red bin secured in the recommended enclosure, and the donation of the old round bin enclosures to a not for profit organisation. The OC Committee has authorised Tideways to order the recommended Woodbury BN50 from the supplier, Urban Design Group. Delivery will be arranged within four to six weeks, and will be installed on the existing concrete pad near the drink tap. If you know of a not for profit who might be able to make use of the old yellow enclosures, please let us know.
Community Working Bee
A working bee has been planned for the weekend of 8th and 9th of February, so please save your preferred date in your calendar. We plan to complete the following tasks, and any others that are suggested in the meantime.
- Clean stains on the concrete benches in BBQ area
- Treat rust on the stainless steel cables and fittings on pergola
- Re-secure light fittings on pergola beams over the BBQ
- Treat pergola beams with wood hardener
- Treat rust on bike maintenance station
- Empty BBQ grease trap
- Remove spider webs from fences, letter boxes and electrical switchboards
- Remove flaking surface of fibreglass planter tubs and re-paint/re-coat
- Prepare for installation of new rubbish bin enclosure
- Remove concrete base from old rubbish bin enclosure at south end of central park
- Landscaping tasks as determined by the Landscape SubCommittee
Central Park Area Maintenance
Thank you to those residents who assisted with the recovery of the lawn in central park by keeping off the area following the top dressing which was applied and the weeding that took place. It was pleasing to see the way the turf recovered from such a bare cover, although there is still work to be done to see the lawn growing the way it should. Please continue to limit vigorous activities on the lawn during this period.
The storm water drain on Stage 3 has been repaired and stabilised to make it effective in limiting the overflow of storm water which was saturating the lawn during sustained rain events in winter.
Common Property Asset Register
The SubCommittee is working to update and audit the Common Property Asset Register which will be used to inform the 10 Year Maintenance Plan which is currently being prepared. This will ensure that the assets of the Flockmill development will be properly managed and maintained in the years to come.